Start of document

History of RP
Ia
The demand for an increased scale of building + the shortage of building steells
led architects to turn to industrialized forms of building
Casting room sized units in the factory with finished surfaces + inserts
of assembly
7 inserts for services
such as underfloor heating + electrical
supply

Assembly on site of pre-cast units
L N of C'hagen
System built in Denmark 48
Technical know how in manufacturing components
+ method of assembly of "
Licence is a licence of techniques
T.W.Anglian Ltd contracts
Formed 62 to undertake L N system in U.K.

After war 2 + 3 story flats - 70 persons per acre
64 North reports that system build would enable maximum No of building to jump
Birmingham Housing committee consider [illegible] project, recommend to council Lot T Witt child
7th Dec 65 MHLG circulars, housing authorities need for industrialized build
1970 target 500,000 houses
means industrialization
After its success + That of National Building Agency
but it emphasised that responsibility for structural stability rests with local authority
July 66
11th March 1968 Ronan Point handed over

Goodfellow - L N system has been throughly investigated by the Engineers Dept of the G.L.C
subjected to investigation + approved by no fewer than 7 District Surveyors
also by consultant engineers approved by their local authorities to
Westfield the system
Structural calculations carefully investigated by Newham.
Or negotiated with
64 Seba layout
approved in principle
for details of cost
of 1000 dwellings

End of document