WESA_12_1_01p20

meeting 10 june 160.
George Messervy - Arch.
Charlton Humphreys Roberts.
M told me he had been employed in Architects
Dept of TWA. Had worked on Lisson Green dev in
conj with Westminsters.
jou pe bc monger to wis.
2 / M thought that there was maybe rust
ring in pre cast units & my inf on this
fougst from Tech Div of TWA. He recalled an
occ when a no of units were sent to site
and found to be cracked. It ap wrong reinf
mesh had been used. The wrong col tag had
been put on the unit a workshop. Messervy
thought that.
3 Ex wall made of a sandwich which consists
of agg + 4" thick conc plus 1" exp polystyrene
and that an internal skin with reinforcement
linked the two. There was danger of sandwich
bowing. M thought ess to check the remaining
panels at R.P. for curvature. George Messervy.
predicted what I found.
He thought most bldg Denmark 8-12 in ht.
Mr RV can arrange to call M.
22 July 1968.
Thermal movements in P.C. struct are well known.
Perhaps Mrs H had never heard sound of
friction caused by thermal movements in heavy
p-cast conc struct if that was the sound
she heard. The noise prod by drill is also
largely due to friction.
L.N. p-c panels are not elec or steam
cured in the mould as they are in most
other systems. The venue coy build quickly
and panels have been erected on site
with a date of less than 14 days.
They stay wet until roof is completed.
There are small holes in the floor units
for draining out the conc. This have
given trouble in the past when people
have put them in too soon before
the panels were comp dry out.