Sam Webb, 'Interim Report on Ronan Point'

Interim Report on Ronan Point
September 1984 Sam Webb RIBA
1.00 Introduction
Ronan Point is a 24 storey tower block consisting of 22
storeys of flats on a two storey podium.
1.01 The block is constructed in loadbearing concrete panels
and floor slabs in an Industrialised Building System
called Taylor Woodrow-Anglian.
1.02 This system was based on the Danish system known as the
Larsen and Nielsen system and was manufactured under licence
in this country by a merger of Myton Ltd. a Taylor Woodrow
subsidiary and Anglian Building Products a major subsidiary
of Ready Mixed Concrete Ltd.
1.03 At the time Ronan Point was built in 1967 Taylor Woodrow-
Anglian were also building Morris Walk Woolwich for the then
L.C.C.
1.04 These flats were the first in a sequence of contracts known as
the Morris Walk Series and were built on various sites in
London for the L.C.C. and later G.L.C. totalling 36 blocks in all.
1.05 Erection teams were trained at Morris Walk and the other estates.
Men from these formed the nucleus around which the Newham Erection
teams were formed.
1.06 Ronan Point is one of four blocks built around a covered car park.
This scheme was designed by the Newham Architects Department and
consisted of 440 flats. During enquiries Taylor Woodrow-Anglian
told Newham that as a number of other authorities were about to
place orders any local authority placing an order for less than
500 flats would have to use basic standard plans using components
going through their factory. As a means of overcoming this Newham
sent a letter of intent to T.W.A. guaranteeing the construction of
1,000 flats.
1.07 Those flats were incorporated into nine tower blocks built in the
following order
1 Abrahams Point
2 Ronan Point
3 Merritt Point
4 Dodson Point
5 Gannon Point
6 Bauckham Point
7 John Sopp Point
8 Ault Point
9 Hume Point
1.08 Ronan Point had only been occupied for 3 weeks when on the
morning of 16 May 1968 there was an explosion in flat 90
and the south east corner of living rooms fell down. At
the time Abrahams, Ronan, Merritt and Dodson were completed.
Gannon Point was 18 storeys high and Bauckham Point was
1 storey above the podium.
Although work on Gannon and Bauckham was initially stopped
after the explosion it was subsequently allowed to continue,
so that by the time the Public Inquiry Report Chaired by
Hugh Griffiths Q.C. was published in November 1968 Newham
had Ronan Point plus five other identical buildings (Nos. 1,
3 4 5 and 6). The National figure for I.B. tower blocks
doubled between May and November 1968.
1.09 The question thenarose as to what Newham should do. The
Griffiths Report set onerous conditions on Newham which had
widespread implications throughout the country.
2.00 Strengthening Ronan Point 1969
Because the partial collapse of the building was held to be
caused by a gas explosion by the Inquiry, this finding tended
to overshadow all subsequent discussion of other events that
could lead to a collapse.
2.01 In the considerable media coverage that the building, not
unnaturally attracted in 1968, other causes of collapse became
overlooked.
2.02 Other factors which could cause collapse were not extraordinary
events any more than a gas explosion was. These events leading
to collapse were:
a) Fire: "... the building may suffer structural damage leading
to progressive collapse as a result of a fire of normal
intensity" Part 111, 1, (10) p.62 - Griffith's Report.
b) Wind: "The building in its present form may suffer structural
damage from high winds and this could lead to progressive
collapse"
Griffith's Report Part 111, 1, (9) page 61.
2.03 It was held that the pressures of the gas explosion that caused
the collapse were between 3 - 12 lb/in². They certainly could
not have been higher as Miss Hodge who lived in the flat was
neither killed nor deafened by the blast.
2.04 Considerable confusion existed at the time of the collapse as
to the exact pressure of the explosion.
2.05 The explosion pressures quoted varied from as much as 7 1/2 tons
per square foot to as little as 1·2 lb/in². A Home Office Expert
Mr. Yallop quoted the higher figure.
2.06 After the Public Inquiry sittings finished a full scale test
was carried out on a test rig at the Building Research
Establishment.
2.07 This test carried out on August 13 1968 three months after
the collapse was the first authentic test ever made on the
structural integrity of the load bearing joints of Ronan Point.
2.08 The H.2 Flank walljoint failed at 1.8 lb/in². This was clearly
not acceptable.
2.09 As an interim measure the Government ordered all gas to be
turned off in system built flats throughout the country.
2.10 It is normal in designing any building to submit structural
calculations to the Local Authority for approval. No calculations
were ever made on the strength of the structural joints of Ronan
Point or the other 5 blocks completed by November 1968:
Abrahams Point, Merritt Point, Dodson Point, Gannon Point and
Bauckham Point. (See para. 33 p. 8 - 9 of The Griffith's
Report). I assume that joint calculations were submitted for
John Sopp, Ault and Hume Points.
2.11 The Newham Engineer responsible for checking the structure of the
block including all the foundations Mr. Hill, was questioned at
the Public Inquiry by Sir Alfred Pugsley: Transcript Day 17
Mon. 29 July 1968 p.33
Q : I suppose you did not consider it your duty to check every
calculation, but you checked the places which you thought
most desirable ?
A : That is correct, sir, yes.
Q : Amongst such places did you check any of the joints that
we have had under discussion here ?
A : No sir, there were not in fact calculations submitted to
substantiate the joints.
2.12 What the Borough Engineer was sent when he asked for calculations
were the following: "a typical floor plan and five typical details
which showed the form of joints that would be executed in various
parts of the structure." Transcript D 17 p.33. He only had two
or three days to check the building.
2.13 A recommendation was made after the Tribunal's findings that Ronan
Point be strengthened to a pressure of 5 lb/in². This applied
to all similar buildings over five storeys throughout the country.
2.14 Something of a dilemma then faced Newham, the G.L.C. and other
authorities. Strengthening to 5 lb/in² would mean pulling
buildings down and rebuilding them to achieve it.
2.15 A series of meetings were then held, culminating in decisions
reached at an all night meeting on 13 / 14 November 1968
between the Government appointed panel of Engineers and the
NFBTE. They reached a compromise.
2.16 Existing buildings were to be strengthened to only 2 1/2 lb/in²
even though the explosive force was "in the region of 3 - 12 lb/in²."
New buildings were to be built to 5 lb/in².
2.17 The method of strengthening adopted by Newham was worked out by
the G.L.C. It was widely publicised and demonstrated to the
Press by Horace Cutler and Desmond Plummer Leaders of the then
G.L.C., at Barley Mow Estate on March 13, 1969, in one of the
Morris Walk Series Estates.
2.18 Strengthening is really a misnomer for what was carried out
using these angles and I raised this at the time in an article,
letters to Arthur Lewis M.P., the Minister of Housing and at
a meeting of the Institute of Structural Engineers which was
called to discuss what was known as 'The Fifth Amendment to the
Building Regulations'.
2.19 My comments at this meeting were published in the Technical Press.
On March 18 1970 Hugh Steele Newhams C.I.O wrote the following to
me:
"You also enquired whether there was any fire protection for the
steel angles forming the strengthening of our Ronan Point type
blocks. Our Architects Department tell me that there is no
specific fire proofing of these angles but they are all covered
by cores and naturally the buildings do conform to the fire
regulations. I trust this is the information you require."
2.20 I mentioned this at the Institute meeting and raised the question
that these angles could not be construed as strengthening because
they were not protected against fire as the Regulations required.
The only conceivable use these angles had was to hold loadbearing
panels in, in the event of an explosion, and that they weren't
structural at all but merely hangers or fixings as defined by the
Building Regulations.
2.21 This brought the following response from Sir Hubert Bennett FRIBA
Chief Architect of the G.L.C.:
"The G.L.C. when deciding on the type of 'strengthening' to be used
on these blocks, naturally had the effects of fire in mind. If
the type of block had required the use of beams or columns in
all probability they would have been encased, as this type of
member, when under load, is subject to buckling or deformation
under the action of heat.
If prestressing cables had been used they would have been protected
from fire and from deterioration. However it was more appropriate,
with the type of block involved to use steel angles bolted to
the wall (or ceiling) junctions. The object of the angles was
to retain the wall in position if a pressure of 2 1/2 lb/in²
was applied to the whole wall area. In all other situations
the angles are completely unloaded." (my emphasis).
2.22 The steel angles that were put into Ronan Point are not
holding it up at all. However they do act as a restraint
to the load bearing walls for pressure and suction loads
up to 2 1/2 lb/in². If an explosion like the one that
occurred on 16 May 1968 were to occur again the building
could still fall down,because the forces reached on that day
were over 2 1/2 lb/in² (3 - 12 lb/in² see para. 2.03 and
Part III, 1, (3), of The Griffith's Report p.61).
2.23 This information is included because at the initial meeting
I had with Mr. Feneron of Building Design Partnership held
at The Grove on April 17 1984 he stated that Ronan Point had
been strengthened to 5 lb / in².
2.24 No such restraint was applied to the non-loadbearing panels
which have bowed. These can be removed from the building
with a pressure of as little as 1/4 lb/in² (see para.118
and 144 of The Griffith's Report) or 35 lb/ft².
2.25 The Griffiths Report (para.145) recommended that the non
loadbearing panels, "should be better secured, aiming to make
them withstand safely a suction of 65 lb/ft²." This was
considered a matter of urgency in the report.
2.26 In the investigations I have made I have found no evidence that
this recommendation was ever carried out. On April 17 I
requested copies of drawings showing how these non loadbearing
panels were held onto the building. At that time the drawings
could not be found and had still not been found in early
August 1984 (Newsnight Report BBC2).
2.27 It is difficult to see what work was carried out to make the
building behave better in a fire and so far I have not been
able to identify any.
3.00 Workmanship
The Erection teams for Ronan Point were trained by T.W.A. at
Morris Walk and other Estates in the Morris Walk Series
including the Aintree Estate at Hammersmith (Lannoy and Hartop
Points) Ocean Estate Stepney, Argyle at Wimbledon Parkside,
and St. Matthews Estate Brixton.
3.01 The London Area Erection Manager of Taylor Woodrow Anglian
was Mr. Charles Phipps. He was responsible for buildings at
Morris Walk, for Ronan Point and for the Aintree Estate. He
was responsible for supervising the workmanship on behalf of
the contractor.
3.02 Mr. Phipps was questioned by the Chairman as to the rate of
progress of the job (Transcript Day 17, 29 July 1968, p.52).
To give some idea of the progress, working a 47 hour five day
week the erection team completed the seventh floor of Ronan
Point on July 2 and erected the fourteenth floor on July 30 1967.
The work was paid for on an incentive bonus system with a
guaranteed minimum wage.
3.03 The men worked from 8am - 6pm sometimes later and often
worked through their lunch period. Sometimes they worked
at weekends.
3.04 Ronan Point was passed for Building Approval before all the
drawings and calculations had beenreceived and indeed the
Griffith Report points out critical calculations were never
received. In fact in August 1968 Sir Alfred Pugsley who wrote
the structural chapter in the Griffith's Report was still
calling for them (see Griffith's Report para. 33 p 8 - 9).
3.05 Thomas North O.B.E, FRIBA was the then Borough Architect.
He was asked how often he visited the site.
Q: I want you to tell the Tribunal now if you will something
of the responsibility in your department for looking at
the job as it progresses. Do you yourself as the architect
or chief architect carry out weekly visits to the job, or
is that someone else's responsibility?
A: No. I think I mentioned on Friday that unfortunately I had
very little opportunity of going out to see jobs.
Transcript D 17 29 July 1968 p.2
3.06 The previous week Thomas North was asked if he had visited the
building at all.
Q: Did you inspect the building at all as it went along ?
A: No. Unfortunately I had little chance to visit this job,
or other jobs for that matter, excepting when the Architect
or Clerk of Works or any of my assistants wants a decision
where something has gone wrong. With buildings that are
running smoothly, of course, I seldom see them until they
are officially opened.
3.07 The first time Mr. North visited Ronan Point was on the morning
of its collapse.
3.08 The building was passed under the old West Ham Building Bylaws.
Formal Application for Approval was made by the Borough Architect
on 11 December 1965
3.09 On 5 Jan 1966 Mr. Hill said he could not check all the calculations
until he had further details.
3.10 On 6 Jan 1966 Bylaw Approval was granted.
3.11 On 1 Feb 1966, the Building Regulations 1965 came into force.
3.12 The old West Ham Bylaws were administered by the Borough Surveyor.
It was normal practice outside Inner London where the London
Building Acts apply for the Borough Surveyor's Building Inspector
not to visit sites which came under the Borough Architect's
jurisdiction. After the approval in Jan. 1966 no inspections
of the superstructure were ever made by the Building Inspector.
3.13 Mr. Williams The Chief Building Surveyor of Newham was responsible
for passing the plans. He was asked about visits to the site by
Griffiths the Chairman.
Q: Would I be summing up the matter, after the foundations
had been overseen by you in this way, by saying you took
no further active part in the supervision of the building
because the Borough Architect was himself personally interested
in it ?
A: That is so.
Transcript D 16 p.51 26 July '68.
Mr. Williams was further asked how often he would have visited
Ronan Point if it had been a private project and not designed
by the Borough Architect.
A: Myself possibly on a big job, an important job like this
I would think once a week, but my staff more frequently."
Transcript Day 16 p.53
3.14 In Inner London a different set of criteria existed, The London
Building Acts & Constructional Bylaws, these are enforced by the
District Surveyor.
3.15 Mr. Hall, one of the D.S's on the Morris Walk series in Wandsworth
gave evidence of the workmanship on that site to the Inquiry:
Q: ...Finally you say there were other matters to which you raised
objections and which had to be remedied. Was there anything
relevant to this Inquiry ?
A: Only if workmanship is relevant to the Inquiry.
Q: In what respect ?
A: The workmanship was in my opinion not up to requisite standard.
The manhandling of units was done without sufficient regard
for their integrity and by the time they got into the work
many of them were cracked or damaged. The lifting bolts
were pulled out of the unit sideways. In cases where they
did not meet up with the holes and the units above they were
ruthlessly burned off, this is all in the early stages of
the job, and I served Taylor Woodrow's with a 'Notice of
Irregularity' at this point and citing altogether eight points
of objection, but as a result of the notice the standard of
workmanship improved. Some of the practices which they had
been adopting were discontinued, and a more strict controlled
by the Clerk of Works prevented units from being incorporated
into the work which had been cracked and damaged in transit
or in erection, and by and large the standard of workmanship
improved as the work went on . . . I had to draw their
attentions on a number of occasions to the fact that they were
erecting another storey on top of a storey that had yet to
be dry packed, and of course it was always an oversight . . ."
Transcript Day 19 p.20 1 Aug.'68
3.16 Mr. Hall was concerned that at Morris Walk which he had seen
the walls did not appear to be adequately tied to the floors
as is the requirement of B.S.C.P.111 part 304, and he was the
man responsible for requiring mechanical ties to be provided.
3.17 In November 1983 I inspected Flat 26 in Ronan Point and discovered
the bowed face panel. This was at the invitation of the Newham
Tenants Tower Block Campaign. On the same day I visited the
Aintree Estate in Hammersmith at the invitation of David Adler
the Chief Structural Engineer of the London Borough of
Hammersmith. I told him what I had found in Ronan Point,
that it was in more than one flat and it probably occurred
throughout the estate. He showed me identical faults in Lannoy
and Hartop Points. I have since found the same faults and
bowing panels at Ocean Estate and Broadwater Farm Haringey.
I was invited to look at this by the Haringey Housing Department.
All these schemes are in Taylor Woodrow Anglian.
3.18 David Adler had opened up joints and fixings in one of the
flats at Aintree Estate. These had exposed locating bolts,
straps etc. In some cases these bolts were bent out of the
vertical and the straps which should have been there were
missing. None of these defects are normally visible and they
have to be opened up in order to see them. The bent bolts
were the bolts under loadbearing flank walls where David
Adler had removed the post 1968 steel angles. These bolts
had the nuts tight up under the concrete wall panel. This
did not accord with the evidence given at the Public Inquiry
where the operatives said the bolts were always wound down.
Some of the fixings to the non loadbearing panels were missing
and David Adler and I are in agreement that this could lead to
the panels falling off. These missing fixings were shown on
the Adam Curtis's BBC2 TV programme on housing shown on 4 Sept.
1984 with Mr. Ackroyd.
3.19 Some days after first meeting David Adler (in Nov.'83) I had
a telephone call from Andrew Davenall of Newham. He told me
that Newham were about to start on an inspection and I told
him of the defects I had then found in Ronan Point.
3.20 Since then I have carried out surveys of many flats and found
a number of instances where the workmanship is not in accordance
with the drawings. I have shown one defect, which I find very
serious, to Mr. Davenall, Mr. Feneron and Mr. Ackroyd. This is
in the living room of flat 42 Merritt Point a two bedroom flat.
The detail on the drawing shows this joint full of concrete with
rammed fibreglass at the bottom. In fact this joint has a
polystyrene slab going down the full depth of the floor as far
as I can see.
3.21 The drypack mortar under the non loadbearing panels is not
in accordance with the drawings. Instead of a compressible
joint of fibreglass with a pointing of dry pack, the drypack
is solid as far as I can see under these walls in Ronan Point
and in Merritt Point.
3.22 This has the effect of bridging between these panels and could
lead to arching over the entire height of the building, from
panel to panel. Instead of each panel being separate, if this
deviation from the drawing is widespread, not one panel but many
could fall off the building. This would be due to vertical
movement, caused by the sun heating the panels up thus expanding
them upwards and the dead weight acting under gravity causing
them to move down. As this wall is restrained by the floor edge
the only way it can freely move is outwards.
3.23 In 1968 or 69 Mr. Black who was then District Surveyor of
Hampstead told me about a block of flats in Brent where a whole
facade of brickwork had sprung off a block of flats. The
brickwork was built off concrete nibs at each floor level, the
edges of the nibs were covered by brick slips. There were no
compression joints. The thermal movement had sheared through
the concrete nibs snapping them off the backing R.C. wall.
The brickwork was secured by expanded metal ties. These
had stretched to some 1'6" (450mm) in length and were allthat
were holding up this precarious mass of brickwork.
3.24 I have had a number of conversations with Mr. Feneron about the
conditions he told me he found in the buildings. On one occasion
he told me he had found 'floor sweepings' in a joint.
3.25 In view of the considerable deviations in joints from drawings,
so far found including the joints between the floor slabs
(the wineglass joint) I find myself in disagreement with Building
Design Partnership over their statement that they haven't found
any joints which disagree with the drawings.
3.26 In 1968 Dr. Bate of the BRS together with a number of Engineers
opened up 15 positions in Ronan Point to inspect tie plates
holding the walls and floors together. Only one of these ties
was correctly fixed and positioned.
3.27 Measurements were taken of the floor slabs to ascertain the
actual bearing. This was done by measuring from the end of
the nib to the line of decoration on the ceiling. It was found
that on some slabs, which were taken down, the bearing was less
than 2" and varied by 1/4" - 1/2".
3.28 Dr. Bate also found that the bolts had not been slackened off
under the loadbearing walls although the workmen on site in
evidence said that the bolts were always wound down. In fact
they talked about "spinning the nut down with the fingers."
3.29 At Aintree Estate the nuts have not sheared through the
threads but the weight of the structure has buckled the
bolts throwing localised undue stress on the wall panels.
3.30 Apart from the Clerk of Works and the Project Architect at
Ronan Point no one else seems to have inspected the
workmanship on behalf of Newham. Much of the workmanship
is hidden and covered up. It has to be taken on trust, but
it does not necessarily follow that what is shown on drawings
will necessarily be what is found on site. My findings so
far lead me to err on the side of caution about the workmanship
at Ronan Point and the other eight blocks.
4.00 Water Penetration
From the earliest days that Ronan Point was occupied there has
been trouble with water penetration through the roof and and
water coming out of weep holes in the ceiling slabs. This
problem also applies to the other blocks.
4.01 I was surprised though to find the extent of water penetration
in Mrs. Curry's flat No.1 Ronan Point. Water had worked its
way along the insitu loadbearing joint H4, between the two
cross walls and floor slabs. This water then ran down the
vertical joint between the internal wall panels.
4.02 This is in the loadbearing structure on the lowest level of
Ronan Point.
4.03 This water is coming in from the outside possibly between the
panels, and finding its way through the H.4 joint. It also
runs through the hollow cores in the floor slabs and runs out
of weep holes in the ceiling of the kitchen.
4.04 During the Public Inquiry evidence was heard about water coming
through similar weep holes in many flats and it was said at
the time that the holes had been left for "drying out" purposes.
Today water still comes out from these weep holes and light
fittings, through the ceiling roses. It comes through
decorations in bathrooms, halls, lounges, bedrooms and kitchens.
4.05 In Merritt Point the water penetration is very serious and in
flat after flat in the upper floors I found evidence of similar
serious water penetration to that found in Ronan Point.
4.06 It does not take a great deal of imagination to work out what
this water penetration is doing to the reinforcement in the joints
and to the concrete which is transferring the loads between the
structural components.
4.07 The long term effect of this water penetration could well prove
catastrophic. It will certainly cause rusting and expansion
of the reinforcement in the joint. Carbonation will take place,
breaking down the concrete in this joint. This will produce
lack of bond between the steel and the concrete. Under adverse
loading these joints will eventually fail. I have little doubt
in my mind that the water penetration I have seen will, if left
unchecked, lead to structural collapse.
4.08 The water penetration in Flat 1 was shown to Sir George Young MP
on his visit and it was filmed by the BBC camera crew from Sixty
Minutes and shown on television on 9 May 1984.
4.09 In view of this I am surprised that it has not been mentioned
by Building Design Partnership in their Report made in early
August or in the Report submitted by George Iley to the Housing
Committee on Aug. 4 1984, particularly bearing in mind that the
engineers now occupy this flat on the first floor of Ronan Point.
5.00 Bowing Panels
The bowing panels were found after a survey carried out in a
number of flats in Ronan Point in November 1983 and reported to
Newham Engineers at the time.
5.01 These bowed panels are widespread in other T.W.A. Estates.
5.02 At a meeting at The Grove Stratford on 17 April 1984 between
John Stratford, Andrew Davenall of Newham Engineers, Stan Feneron
of BDP, Brian Pratt Acting Director of Housing and myself, at
which Fred Jones was present and Jean Reeves was in the chair,
the bowed panels were discussed. Two fire officers were also present.
5.03 Mr. Feneron was then of the firm opinion that the panels had stopped
moving and that no movement was now taking place.
5.04 A number of people had by thentold me that the panels moved.
This was not just a sample in Newham but included tenants from
Hammersmith and also David Adler. In fact at Aintree Estate
the curvature is such that it is possible to see from one flat
to another through a gap between the end of a wall and the centre
of a panel. These gaps open and close during the day depending on
the outside temperature.
5.05 We discussed at the meeting if any research had ever been carried
out to study the effects of bowing. Mr. Feneron mentioned a
report that had been written as long ago as 1960 on the phenomenon.
5.06 When I carried out investigations for Hunslet Grange Heating
Action Group in Leeds in 1976 I found similar defects with bowing
panels. A Report was found froman American Publication which
specifically dealt with the problem:
"Precast Concrete Wall Panels: Bowing Warpage and Movement"
by Sheng Pao Sheng
This was a paper delivered at a conference in Texas in March 1964.
It was found by the tenants.
5.07 The history of Hunslet Grange, which has now been demolished,
is fairly well documented. I have a copy of a report from
Mr. Barber, the Structural Engineer advising Leeds, which states:
"There are letters on file regarding the bowing of panels from
the very earliest castings and there is evidence that this is
not an unusual problem in this form of sandwich construction."
He was referring to a buildings contemporary with Ronan Point.
5.08 The reason for making this point is a simple one. If it was so
widely known during the 1960's that such sandwich panels bowed
why was no account taken of this phenomenon in the design of
Ronan Point particularly at the joint between the edge of the
floor slab and the non loadbearing panel to prevent fire passing
through ? The West Ham Bylaws required this.
5.09 There are questions in the Transcript about bowed panels.
However early on the Inquiry specifically ignored the non-
loadbearing panels in Ronan Point. I hope to be able to
present further information on this at a later date.
6.00 Wind Loading
At the 17 April 1984 meeting, I stated that the floor slabs
in Ronan Point acted as a horizontal diaphragm to distribute
the wind loads in the structure. Both Mr. Feneron and Mr.
Davenall disagreed with me about this. I have written to
Mr. Armstrong of B.D.P. concerning this but did not receive
a satisfactory reply.
6.01 I would be interested to know if any change in view has taken
place since April.
6.02 I have not finalised my findings on wind.
7.00 The Fire Test 18 July 1984.
The fire test carried out on Ronan Point demonstrated not only
the effect of a fire on the temporary skirting but the effect
of a fire on the integrity of the structure as a whole.
7.01 Paras. 148, 216 and Part III 1 (10) of the Griffith's Report
deal briefly with the effects of fire on the structure of Ronan
Point.
7.02 The temperatures reached in the fire test appear to have taken the
F.R.S. completely by surprise. Yet para. 148 clearly states
"But the point now raised concerns the effect on the flank walls
of the expansion of a ceiling or floor due to the very high
temperatures that can arise in a fire in domestic premises."
7.03 The effects of the fire on the floor and the loadbearing structure
also seems to have taken the engineers by surprise.
7.04 I was told by Andrew Davenall as he came out of Ronan Point
with Stan Feneron of B.D.P. that he thought Ronan Point was
about to collapse.
7.05 Some discussion was reported to me of instructions to clear the
nearby houses to safeguard the people living in them.
7.06 Irrespective of whether or not the skirting did its job, the fact
that the internal load bearing walls moved as much as they did
caused the Engineer to order the evacuation of the building.
7.07 The experts who came out of Ronan Point just after the fire was
put out were very frightened indeed.
7.08 I have no doubt whatsoever that if that fire test had been a
success then it would have been immediately announced instead
nearly three hours elapsed before we had a meeting with the experts.
7.09 It should be appreciated that the fire was near the bottom
of the block where the loads on the walls are at their
greatest to resist any rotation of the joints. The bending
of the floor never theless produced structural movement.
What would have been the effect if that fire had been in
the top of Ronan Point where the loads on the walls are say
20 times less ?
7.10 It has been reported to me that another fire test is being
considered for Ronan Point Three floors will be dismantled
and reassembled in some safe place. The reason given for not
holding it in the building again is fear of collapse and danger
to surrounding buildings.
7.11 If this is the case then surely it proves that the building's
structure cannot be adequately fireproofed ?
8.00 External Conditions of the Building Fabric
Mr. Iley's report of Aug. 4 1984 to the Housing Committee
mentions 5 major items of repair to Ronan Point costing £700,000.
8.01 The list omits any mention of water penetration through the
joints outlined in section 4 of this report. To rectify this
could cost almost as much again as it would entail a virtual
raincoat around the block.
8.02 The repairs suggested by Mr. Iley are only for 30 years. There
is no guarantee that they would work for that period bearing in
mind Ronan Point is only 16 years old now.
8.03 The remaining loan period on Ronan Point is another 44 years.
Any repairs should last that long. Given that no repair to the
roof since 1968 has been able to stop it leaking I think we
should view with some caution any claims to put this building
right.
Note this is an interim report.
Sam Webb RIBA
Newham Tenants
Tower Block Campaign
September 12, 1984