Sam Webb, 'Flat 26 Ronan Point Custom House London'

Flat 26 Ronan Point Custom House London
1.00 My name is Samuel Webb and I hold a Diploma in Architecture with
Honours from the Northern Polytechnic 1962. In 1965 I was elected
an Associate of the Royal Institute of British Architects.
1.01 I am the Senior Lecturer in Advanced Technology in the School of
Architecture, Canterbury College of Art, Canterbury, Kent, a post
I have held since 1975. I have worked as an Architect in a number
of offices including Somerset County Council, the London Borough of
Camden and Design Research Unit.
1.02 In 1973 and 1978 I was elected to the RIBA Council. I have served on
the RIBA Education Committee, the ARCUK Board of Architectural
Education and the RIBA Building Control Panel. This panel is
concerned with matters of Building Codes and Regulations etc.
1.03 Also I have worked with George Fairweather FRIBA who was Advisor
to East Ham Borough Council over defects in Plashett Grove School
when parts of the cladding fell off. This case is known as East
Ham v Bernard Sunley. In 1968 I helped George Fairweather prepare
evidence he gave at the Ronan Point Public Inquiry.
Flat 26
2.00 I inspected flat 26 on the 6th floor of Ronan Point on two occasions :
Thursday 17th November and Monday 21st November. On both occasions
Mr. Barry Meekings, the tenant, was present as were other people.
The system of construction is called Taylor Woodrow Anglian. The
flats consist of 22 floors sitting on a podium of reinforced concrete.
The flats are constructed of unreinforced precast concrete load-
bearing and non loadbearing panels with reinforced concrete floor
slabs. There are 66 one bedroom flats and 44 two bedroom flats.
Flat 26 is a 2 bedroom flat on the South West corner.
2.01 Mr. and Mrs. Meekings had complained that they could hear people
talking from the flat above and below them. Also they could hear
the televisions from these flats.
2.02 It was possible to drop a piece of paper 2" wide and 11½" long
between the edge of the floor slab and the face wall panel at
skirting level in the living room.
2.03 This piece of paper went down under its own weight. The gap it
passed through was some ¼" wide at its widest point.
2.04 From the living room of flat 31 on the 7th floor I could pass
another piece of paper down between the edge of the floor and the
face wall panel at skirting level. I spoke to, and quite clearly
heard people in the flat below through the gap. This can be
verified on site.
2.05 The pieces of paper showed about 2" above floor level, some 9½"
having passed into the gap. Pieces of grit and dirt frequently fall
down this gap, dust comes down when the hoover is pushed along by
the skirting in the flat above (no. 31).
Construction and Bylaws
3.00 The flats were built by Taylor-Woodrow-Anglian Ltd using the
Larsen-Nielson system.
3.01 The bylaws for the Building are the West Ham Building Bylaws,
Plans were deposited in November 1965 and Bylaw Permission was
given in January 1966.
3.02 These Bylaws are based on the Model Bylaws Series IV Buildings
1953 Edition published by the Ministry of Housing and Local
Government. The West Ham Bylaws were made under the Public
Health Act 1936.
3.03 The constructional principles on which Ronan Point was built, were
not specifically covered in the West Ham Bylaws but the building had
to comply with the functional requirement on structure. This
functional requirement in these bylaws is bylaw 21 : 'General Load-
bearing requirements' which states -
21(1) 'The load-bearing structure of a building above the
foundations shall be capable of safely sustaining and
transmitting the dead loads and imposed loads and the
horizontal and inclined forces to which it may be subjected
without exceeding the appropriate limits of stress for the
materials of which it is constructed and without undue
deflection'.
3.04 In December 1979 in the High Court Judgement brought by Newham
against T.W.A., Mr. Justice O'Connor found that there was non-
compliance with Bylaw 21 by the designer of the system for Ronan
Point.
3.05 It was also held that the building did not comply with the 'deemed
no satisfy' clauses of CPIII 'Structural recommendations for load-
bearing walls' and CP 114 'The structural use of normal reinforced
concrete in buildings' was not held to be relevant.
3.06 CPIII was not complied with because the straps between the flank
walls and floor slabs were not held to be mechanically joining the
wall as required by part 304 of CPIII.
3.07 CPII4 applies to Reinforced Concrete buildings. Ronan Point was
constructed throughout the 22 floors of flats as loadbearing plain
concrete. The walls are only nominally reinforced. None of the
joints could take bending forces, although the floor slabs are
reinforced.
3.08 It is necessary that the constructional principles are defined in
order that compliance with the note 'Fire Resistance General' can
be satisfied.
3.09 As the building does not comply with either the third schedule or
the fourth schedule in terms of structure, then the requirements of
BS 476 : 1953 must be applied.
3.10 No one has suggested that the elements of this building -
wall panels either loadbearing or non loadbearing or the floor
slabs would not pass the fire test laid down in BS 476 : 1953.
However, the real problem is not in the fire resistance of the
panels but in the joint between the edge of the slab and the
insitu beam under the non loadbearing face wall panel.
3.11 This joint has broken down and the evidence that paper can be
passed down it for the full depth is evidence of this. This
means that there is no compartmentation between flat 26 and the
flat above 31 and below 21. Fire, smoke fumes and lethal gases
can pass through this gap. This gap constitutes a fire risk.
The building does not comply with the requirements of the Code
of Practice on Means of Escape or the compartmentation requirements
of the Bylaws.
Fire Risk
4.00 The fire resistance of this building is laid down in the Table
of the bylaw 45 and for a domestic building exceeding 50 feet
in height, the fire resistance is one hour.
4.01 Bylaw 38 states that 'external walls of any building other than
a small house shall subject to the provisions of bylaws 39, 40, 41,
be non-combustible throughout and have a fire resistance of two
hours'.
4.02 The loadbearing walls of Ronan Point consist of a sandwich of 7"
loadbearing concrete, 1" of polystyrene and an outer skin of 4" of
concrete with an aggregate finish.
4.03 The non loadbearing walls consist of a series of panels with
windows. This is also a sandwich construction of 4" inner leaf,
1" polystyrene and 3" outer leaf.
4.04 The reason the gap is occurring is because this panel is bowing
outwards at mid span.
4.05 The panel is hung off the cross walls, it is not loadbearing
although the total height of these panels is 22 storeys.
4.06 The Fire Requirements for compartmentation in the Building Bylaws
under which this building was constructed do not deviate far from
the meaning of the present Building Regulations. In terms of fire
resistance each flat must be a separate volume. It must not be
connected with other flats. Flat 26 does not meet this criteria.
The Code on Means of Escape has to be complied with too.
4.07 The bowing of the panels has a number of causes. Thermal expansion
is one. In time one or more panels could fall off. As these panels
provide a measure of lateral stability then their removal will
cause a measure of structural instability. How the building will
behave is debatable.
4.08 It will be difficult to remedy the defects in these panels.
Personally I don't think they can be 'un-bowed' or made flat. With
Georgian brick buildings it is possible to pass rods through
the floors and by means of heating the rod and tightening screws
to literally pull the front facade back. We are all familiar
with this procedure.
4.09 But these concrete buildings cannot be rectified in this way.
The bowing of the panels is not stable, it will increase not
decrease. In short the gaps will get wider, the behaviour of
the panel will become unpredictable.
Conclusion
5.00 The junction of the floor, ceiling and window walls of Flat 26
Ronan Point on the south west corner of the sixth floor will
allow fire smoke and poisonous fumes to pass from other flats
into flat 26 (see 2.00 - 2.05).
This constitutes a 'statutory nuisance' under the Public Health
Act.
It is prejudicial to health as defined by the Public Health
Act 1936 Section 92 1(a) Part III (para: 2.00).
Sam Webb RIBA
The Senior Lecturer in Advanced Technology
School of Architecture,
Canterbury College of Art,
Canterbury, CT1 3AN