Memorandum, Hartopp/Lannoy

LONDON BOROUGH OF HAMMERSMITH & FULHAM
DEPARTMENT OF THE BOROUGH ARCHITECT
MEMORANDUM Date 12th October 1984
From: CHIEF STRUCTURAL ENGINEER Ref:
To: ASSISTANT BOROUGH ARCHITECT (HOUSING) Ref:
HARTOPP/LANNOY
As structural engineer to this Council I consider that, following the
information coming out of the Ronan Point report, the tenants of Hartopp
Point and of Lannoy Point may be great danger from collapse of all or part
of these buildings in certain, admittedly remote, circumstances. However,
it is possible that the chances of a death occurring from this cause are
greater than those from smoke penetration through the openings regarding
which you are so concerned. It is therefore my considered opinion that the
investigation of the flank walls to assure ourselves that the defects are
not significant must be undertaken without undue delay. Should an incident
occur as a result of delay occasioned by our bureaucratic procedures we should
all be held responsible.
[signed]
CHIEF STRUCTURAL ENGINEER