T.W.A. BLOCKS BRIEF
FOR DEVELOPERS

LONDON BOROUGH OF NEWHAM

TAYLOR-WOODROW (ANGLIAN) BLOCKS AND ASSOCIATED PARCELS OF LAND
CANNING TOWN E16: PROPOSED REDEVELOPMENT

BRIEF FOR PROSPECTIVE DEVELOPERS

1. The proposal

The London Borough of Newham will offer the sale of eight 22 storey
vacant tower blocks plus associated sites. The Council is prepared
to sell sufficient land to enable the tower blocks to be
demolished, so that the value of each site offered as part of this
proposal will equate to the cost of demolition of the tower
block(s) situated on each site. The developer will be given the
opportunity to specify the site area required.

Background

2.2 The eight tower blocks are now vacant and the Council considers it
vital to ensure their demolition and redevelopment as quickly as
possible. However the Council also recognises that the land and
housing market in Docklands is not buoyant and is issuing this
revised brief to promote new development possibilities.

2.3 Redevelopment for housing is seen as the most feasible option.
Limited workshop/small office uses may also be considered where
these will not annoy neighbouring residents. Sites to be retained
by the Council may be used for much-needed community facilities
such as an under-5's centre or community education centre.

The TWA blocks and their demolition

3.1 The development sites are shown on the attached plans

(1) Abrahams Point (A) Radland Road E16 (whole site - approx. 1.2
acres)
(2) Merritt (A) Dodson (A) Gannon (A) Points plus site of Ronan
Point, Maplin Road E16. (whole site approx. 3.7 acres)
(3) Bauckham (A) John Sopp (B) Ault (B) Points
Freemasons Road E16 and Hume Point (B) Jersey Road
(included as one site - area of both whole sites approx. 1.6
acres)

3.2 Each block contains 110 flats: 66 x 1 bed, 44 x 2 bed. They were
all built between 1966 and 1970 using the Taylor-Woodrow (Anglian)
large panel system. The 5 type A blocks are essentially' similar to
Ronan Point, though they incorporate certain additional
strengthening works: in 1985 the full costs of remedial works and
refurbishment to a Type A block was estimated at around £60,000 per
flat. The 3 Type B blocks were completed to a modified design
after the partial collapse of Ronan Point in 1968. Ronan Point was
itself dismantled in 1985/86 at a cost of some £650,000, though
this cost was higher than normal because of the particular method
of demolition.

3.3 The sites will be disposed of individually or collectively and each
sale will incorporate a covenant requiring the demolition of the
blocks within two years. The Council will retain ownership of the
residual land which will not be disposed of as part of this bid on
Maplin Road and Radland Road.

3.4 An outline of the area formerly occupied by garage structures is
shown on the attached plans. However developers should not rely on
these and should undertake their own site investigations.

Redevelopment

4.1 The sites should be redeveloped for low-rise housing, mostly family
houses with gardens. New development should not exceed three
storeys in height.

4.2 The layout of the new housing development must not prejudice the
later development of any adjacent sites, and should also take
account of existing housing.

4.3 Density limits are shown on the attached extract from the Stratford
and Canning Town Local Plan.

4.4 Car parking provision should be within curtilage where possible and
110% of housing units.

4.5 Information in this brief will not prejudice the determination of
any planning application and interested developers should contact
the Planning Officer (Andy Butler 471 1430 ext 22188) for futher
information.

4.6 L.B. Newham is seeking finance from the Housing Corporation for
shared ownership and rented social housing. If developers wish to
enter into discussions regarding possible partnerships with Housing
Associations further information will be provided.

5. Presentation

5.1 The Council will consider the disposal of the sites individually.
Developers will be required to indicate which site or sites they
are interested in.

5.2 The area of land required by the developer must be shown on a
1:1250 or larger-scale site plan. Any cash adjustment should be
specified in the submission.

5.3 A layout of development proposed is not required at this stage:
however it may be to the developer's benefit to discuss sketch
schemes with the SOCATACH Project Director.

Attachments
1) Plan showing all sites
2) Outline plans of three tower blocks sites
3) Possible sale sites
4) Demolition brief
5) Extract from Stratford and Canning Town Local Plan
6) Description of Ronan Point

[Diagrams]

TWA_53-01
117 of 150