1.0 INTRODUCTION

1.1 This report contains the proposal put forward by the
T.W.A Community Group, to bid for the demolition and
rebuilding of four of the six sites offered by L.B.Newham
in their "T.W.A Blocks Brief for Developers".

1.2 The T.W.A Community Group was formed by local residents
specifically to provide the community's response to
L.B.Newham's brief and its implementation. Their
intention is to provide a viable "community-led"
development initiative placing the wishes and needs of
local residents in the centre of the proposal, rather
than accept the residual offerings that a typical
"developer-led" scheme would promise.

1.3 To this end, the assistance of local Housing Associations
has been sought in assembling a Consortium of Housing
Associations, private Contractor-Developers and the T.W.A
Community Group, with the result that the proposal is
both commercially viable and competitive in the short
term, and substantial in terms of revenue and management
in the longer term.

1.4 The importance of the six sites offered for redevelopment
by L.B.Newham, to the local community, cannot be over-
stressed, it represents a tremendous opportunity to
correct many of the anomalies which have blighted the
area for so many years.

- The housing will provide both
affordable rents in a range of accommodation up to four
bedroom houses, as well as housing for sale or shared ownership,
targeted at tenants in the area.

- A sheltered scheme is proposed.
- A row of workshops, based on the successful and
established model of Coin St is proposed for
Freemasons Rd, with a view to rehabilitating this
street as an attractive thoroughfare.
- The site for a community school will be made
available on Freemasons Rd in a prime location, and
a proposal to improve the park to the north of the
sites is put forward.

1.5 Even within the financial constraints of commercial
lending, and the Housing Corporation's allocations, the
Consortium of Developers, Housing Associations and the
Community feel it is possible to redevelop these sites
within a timescale of four years. The make-up of the
group will ensure that pressure will be maintained to
avoid the trap of the sites being held speculatively and
undeveloped.

1.6 The Proposal details;

2.0, the history of the initiative.
3.0, the structure and aims of the T.W.A Community Group.
4.0, a planning context.
5.0, the proposals.
6.0, the development assumptions on which the proposals
are based.
7.0, proposals for community involvement, and a method of
achieving the community's voice in the planning of
the area.
8.0, the development vehicle.
9.0, Appendices - equal opportunities
statement (SOLON CHS)
members of the Consortium

3.0 Structure and aims of the T.W.A Community Group
3.1 OBJECTIVES
The objectives of the group will be

1. To work to promote the redevelopment of the TWA Site
in Custom House.

2. To insure that any redevelopment which is undertaken
is done so in partnership with the local community.

3. To work to promote the provision of living, working,
educational and social facilities in the
development.

4. To work to promote the harmonious functioning of a
multi racial community and to work towards the
elimination of all form of racism within the area.

5. In the furtherance of these objects:
a) To represent the views of the local community in
consultation with all agencies in the redevelopment.
b) To insure that the control of the project is always
with the local community and not with any other body
including political parties and local government
agencies.

3.2 MEMBERSHIP
Membership of the group, shall, without discrimination,
be open to all Tenants Associations and Community Groups
in housing districts 2 & 3.

3.3 CONDUCT OF BUSINESS
The business of the group will be conducted by a
committee elected at each AGM. The committee shall
consist of a chairperson, Secretary and Treasurer and two
representatives from each Tenants Association and
Community Group involved in the redevelopment.

The composition of the committee shall as far as possible
represent the multi-racial character of the area.

Elected councillors of the local authority shall not be
eligible for election as officers of the group.

The election or removal of officers of the group may only
be carried out at a General Meeting or an Annual General
Meeting.

3.4 COMMITTEE MEETINGS
The committee shall meet as and when necessary and not
less than once a month. Committee meetings will be open
to any member of the community who live within the area.
Non members of the committee may speak but not vote.

3.5 OPTION
The committee shall co-opt any person that may be of
assistance to the group. Co-optees shall not have a vote.

3.6 ANNUAL GENERAL MEETING
The committee shall call an Annual General Meeting of the
association each year in the month of September. Not less
than fourteen days notice of the Annual General Meeting
shall be given to all Tenant Associations and Community
Groups within the area.

At this meeting the committee shall:
Present a progress report.
Present Audited Accounts for the year.
Elect a new committee and officers.
Elect an auditor for the following year.
Discuss any proposals submitted to the committee at least
seven days in advance.

3.7 GENERAL MEETING
Not less than four of the committee meetings shall be
general meetings of the group open to all members to
speak and vote. All decisions shall be taken by a simple
majority of full members present and voting. All members
will be given at least seven days notice of any general
meeting.

3.8 SPECIAL GENERAL MEETINGS
The Secretary shall call a Special General Meeting at the
request of a majority of the committee or on receipt of a
written petition by not less than one third of the
members of the group. The secretary shall give not less
than seven days notice of the Special General Meeting
which shall take place within twenty one days of the
receipt of the request or the petition.

3.9 QUORUM
The quorum for committee meetings of the group shall be
one third of its elected membership or four members
whichever is the greater. The quorum for all general
meetings shall be one third of the membership.

3.10 FINANCES
Any finances raised by the group will be administered by
the treasurer and will be used only in furtherance of the
objects of the group as set out in this constitution.

The treasurer will open a bank account in the names of
the group and will be responsible with one of two other
signatories for the signing of cheques on behalf of the
group.

3.11 DISSOLUTION
A decision to dissolve the group can only be taken at a
general meeting of all interested parties. Fourteen days
notice must be given and the meeting must be called by a
combination of not less than one third of the members.

5.0 INTERPRETATION OF THE BRIEF

5.1 HOUSING MIX

The housing mix has been drawn up in consultation with
the planning authority to provide an appropriate mix of
housing, and private developers.

The proposal has been developed to be financially viable
should public funds be unavailable. However, it is
expected that as allocations become available to the
various Housing Associations in the Consortium, they will
take on a sizable proportion of the housing units, and
will design and develop their schemes to suit their
particular needs via design and build schemes with three
Contractor Developers who would be already on site.

In anticipation of this, an unusually large number of
(uneconomic) 4bed x 6 person houses and 2 bed/3-4 person
flats have been incorporated into the appraisal and
scheme.

The following table:
Site 1B/2P Flats 2b/3-4p Flats 3b/4-5p Houses 4b/6p Houses Total"
1.Newbuild 3 4 16 13 36
2.Newbuild 9 12 42 33 96
3.Newbuild 30 14 39 27 110
5.Refurbishment 66 44 0 0 110
(Tower Block) (Hume)

TOTAL 352

5.2 ANTICIPATED OCCUPIERS
- A sheltered scheme, containing up to 25% flats + warden
is accommodated in the 1b/2b mix of flats.
- The tower block (Hume) would be renovated as student
accommodation or cheap shared equity schemes.
- Almost all of the large family houses are to be rented
although some may be offered for sale of shared equity
purchase. A smaller proportion of the other
accommodation will be for rent.
- The 1 bed flats and 2/3 bed houses will be for sale and
rent.

5.3 PROPORTION OF HOUSING FOR SALE AND RENT
It is not possible to determine precisely the mix of
housing for sale or rent; this will emerge as funding
becomes available to Housing Associations through the
life of the scheme. The large number of Associations
involved with the Consortium will ensure that a sizable
proportion of homes will be publically or charitably
funded.

The advantage of having a Housing Association owning the
land and project managing the scheme will mean that
Associations will be able to exercise their options more
easily, and that the schemes will actually go ahead as
anticipated.

5.4 HOUSING STANDARDS
Housing for sale will be to NHBC standards; while shared
ownership schemes and rented accommodation will be to
Housing Association Standards, which is be similar to
Parker Morris.

The housing mix proposed does not maximise the density of
the site. When Associations exercise their options to
build accommodation, there will be room to adjust the
boundaries between development plots to allow for the
higher space standards.

5.5 WORKSHOPS B1

A site will be made available on Freemasons Rd for
community workshops and studios.

The design and management of these is under
consideration, however it is intended that the scheme
will be available at low rents to assist job creation.

Funding for the workshops will be available from a
combination of surpluses from the housing development,
grants from the DOE and charitable contributions. The
timing or phasing of this development will be dependant
on the progress of the overall scheme.

5.6 EDUCATION FACILITIES
Newham Community College is interested in establishing a
hall and about three classrooms in the area. A further
site could be made available for this out of the overall
development, on Freemasons Rd.

Funding would probably have to be through the local
authority at the appropriate time.

5.7 DESIGN AND PLANNING
Detail design will have to await the outcome of the bid,
as the Consortium wish to avoid abortive fees in
developing a scheme which takes full advantage of the
existing infrastructure and foundations available on the
site.

An overall block plan has been included to show the
locations of the various uses on the site.

5.8 BLOCK PLAN

6.0 DEVELOPMENT APPRAISAL
6.1 Sites 1,2,3.
The idea behind the appraisal is to take a worst case
scenario, for Housing Associations, and assume that no
funding will be available for social housing.

Housing Units Size Sqm Build Cost (excl Demolition) Demolition Cost Values
1b/2p flat 37 665 500,000 per block 52,500
2b/4p flat 55 635 65,000
2b/4p house 60 575 69,950
3b/5p house 65 575 79,950
4b/6 p house 80 575 89,950

Interest rates @ 14% = 6 months lead time
Build period = 6-8 months
Void sales period = 4-6 months
(houses to be sold at rate of 4 per month throughout the
development)
In this appraisal, based on a three year development
period;

Site 1 would generate a surplus of 188,289
Site 2 " " " " " 197,052
Site 3 " " " " 382,443

6.2 SITE 5
It is not possible to demolish or renovate (to an
acceptable standard) the tower block economically at this
moment in time. At least a third of the surpluses of
sites 1-3 would have to be used to refurbish this
building.

7.0 PROPOSALS FOR COMMUNITY INVOLVEMENT

7.1 Community Planning - "Planning for Real"

The T.W.A Community Group want to help establish
Freemason's Rd a high street for Canning Town with
improved rail transport links at its southern end, and
the park and schools to the north.

To enable detailed and local knowledge and wishes to be
embodied in an overall plan, 'Planning Aid for London' (a
branch of the Town and Country Planning Association), can
offer a particular technique which can resolve
conflicting ideas in such a way that a pattern of uses
can emerge by a consensus which can genuinely lay claim
to the title of 'Community Plan'.

"Planning for Real" involves public meetings where local
people use a model of the site to be considered, and
under the guidence of a qualified moderator set down
preferences and constraints for the use of land. The
technique thus benifits from the detailed and
irreplaceable knowledge of local people and provides an
invaluable basis for future refinement by the development
team.

7.2 HOUSING
There are two main proposals for community involvement in
the housing schemes;

1) Selfbuild
A selfbuild scheme could be made available for local
residents, either through Laing Homes or an independant
self build consultancy / agency.

2) Local involvement in the Development of Rented
Housing;

75% of the eventual rented housing will be let to people
nominated by London Borough of Newham. There is no scope
for involvement of these future residents in the planning
of the scheme, as allocations are only made when the
housing is ready for occupation.

In addressing this problem a sub-group (called T.W.A
Community Housing Group) made up of local people will
look at this development to see that it meets their
aspirations and needs.

The T.W.A. Community Housing Group would be in a position
to promote the establishment of a registered Housing Co-
Operative which could receive the guidence and training
necessary from Solon CHS, to enable it to play an active
role in all the stages of the housing development
process.

7.3 COMMUNITY WORKSHOPS
For the proposals on community workshops see section 5.5.

7.4 COMMUNITY EDUCATION
For the proposals on community education facilities, see section 5.6.

8.0 DEVELOPMENT VEHICLE

8.1 The developer/contracors involved in this proposal are;

Laing Homes (Design and Build)
Alfred McAlipine Construction Ltd (Design and Build)
Countryside Houses (Design and build)

8.2 The Housing Associations involved in this proposal are;

London & Quadrant
Sammuel Levers Trust ?
ELHA, with a consortium of specialist Associations
Solon CHS
Family HA
ASRA HA
Ujima HA
Rodinglea HA
Look Ahead HA
Boleyn & Forest Shared Ownership Society
F.H.A Shared Ownership Society

8.3 The consultants who will contribute to aspects of this
scheme are;

Hunt Thompson Associates
Archtype

8.4 Organisation of the group
?

TWA_45-01
89 of 150