Sam Webb, Drawing of 1 Hour Construction 1957

HAND-DRAWN diagrams
Title: 1 HOUR CONSTRUCTION 1957
Location: Not stated
Company: Not stated
Text from diagram:
- metal turn
- Timber packing piece
- SLAB
- Requirement that upstand wall be 9" thick (party wall in roof) but DS granted waiver to allow equivalent deemed to satisfy 1 hour
- BEDROOM
- Galvanised steel opening windows - probably by CRITTALS opening in
- 8" x 5" x 2 1/2" cill
- 3/4" window board
- 4" Thermalite
- 1/2" plasterboard
- 2 3/4" x ? skirting
- Timber floor boards
- Suspended floor
- 1/4" Georgian wired glass
- 1/2" plasterboard / al backing
- air gap
- SLAB
- ORIGINAL DETAILS DRAW 1/2 FULL SIZE
Other text:
- Lakanal House - original 1957 details approved by DS made S 20 waiver as wall is not 9" solid brickwork - dwg made by Sam Webb during which review on 14/3/2013
- 1 HOUR CONSTRUCTION 1957
- DRAWN BY W. SOLMAN (design team)
- DWG 46/165
- PANEL WALL DETAILS
- 14/3/2013 (SW)