Sam Webb, Summary of LPS Issues

When WW2 ended in 1945, Europe lay in ruins. People needed homes. There was a
need for radical new solutions. Politicians seized on factory made homes. None
more so, than Sir Keith Joseph MP, Minister of Housing, whose family firm was
Bovis. A seven-minute standing ovation at the 1963 Tory party conference assured
acceptance of his programme to build 400,000 houses a year. System built, they
would use unskilled, cheap labour, on site.
The London County Council had the largest public architect’s department in the
world, and a huge housing deficit. Keith Joseph lured the LCC with a serial housing
contract of 1800 flats. This Morris Walk Series contract was instrumental in
encouraging the merger between Taylor Woodrow and a subsidiary of Ready Mixed
Concrete, Anglia Construction, which made precast concrete and specialized in high
quality concrete in Arne Jackobsen’s St Catherine’s College Oxford.
The new firm, Taylor Woodrow Anglian, or TWA, was encouraged to purchase a
licence from Larsen-Nielsen of Copenhagen to manufacture their large panel
system. What they bought was a system, safe to build up to 4 storeys. However,
they modified the unreinforced H2 joints and took it up to 22 storeys at Ronan Point.
LPS structures are like a “house of cards” made of concrete panels. Floors and walls
rest one upon the other, held together only by their own weight, until a lateral force is
applied.
On 16th May 1968, a small gas explosion removed load bearing flank wall panels,
bringing down the southeast corner of Ronan Point, killing 4 people and injuring 17.
The UK housing programme came to a shuddering standstill. It has never recovered.
A public inquiry was held. Work on all LPS sites stopped. Then, following a
questionable test at Imperial College, which gave false readings, work was allowed
to restart. In August 1968, a full-size loading test, ordered by Sir Alfred Pugsley, the
engineer member of the Public Inquiry Tribunal who was suspicious of the Imperial
College test, revealed the critical H2 joint failed at 1.8psi. The Minister of Housing
ordered a complete shut off of gas in all LPS blocks. We have been here before.
So too had the then government. Two days after part of Ronan Point fell down,
Cleeve Barr, Chief Architect, and Dr Chan, Chief Engineer, of the National Building
Agency calculated that the H2 joint would fail at 1.4psi. Their secret report was sent
to James Callaghan MP and Home Secretary. To make this figure appear safer it
was multiplied by 144 to give 200psf. That sounded so much safer – except they
were the same force. Politicians and the building industry were in denial.
Because work restarted on LPS sites, it resumed with a vengeance. By the time the
HMSO report was published there were twice as many LPS tower blocks as there
had been 6 months earlier. The report didn’t say how these blocks could be made
safer, that wasn’t its purpose. Defined by narrow terms of reference, the main object
of the inquiry was to keep politicians, of both parties, out of trouble.