Mrs Lexa Reid
5 Hartopp Point
Pellant Road
London SW6 7HG

Ms Jo Rowlands
Director of Planning, Regeneration and Housing
Lb Hammersmith & Fulham
The Town Hall
King Street, London W6 6JT

1st July 2017

Dear Ms Jo Rowlands,

Re; Proposed installation of overcladding at Hartopp and Lannoy Point

I am a long term Tenant at the above estate and I am writing to you as I am concerned about the safety of the 13 storey building that I live in. Our 2 tower blocks, Hartopp and Lannoy Point, each have 56 flats in them. They were constructed by Taylor Woodrow for the GLC in 1967

For many years, I was the Secretary of the Tenants Association for our 2 blocks. We no longer have a TA, but I have continued to attend inspection walk-abouts with Council staff. The last such inspection was back in March 2017. It is very frustrating that the Council do not act on the findings of these estate inspections. My husband Alan who supported me in these matters, has recently gone into a residential home.

I have raised this issue of the safety of the towers in the past with officers of the Council but I now must insist that you take the fire safety of our estate seriously.

First, some important background information;

I am an original Tenant of this estate having first taken a tenancy in Lannoy Point in 1967 and then moving across to Hartopp Point in 1970 when there were major strengthening works carried out. These strengthening works had to be carried out following the progressive collapse of the Ronan Point Tower block in Newham in 1968. Our 2 towers suffered from the same defects structure-wise as Ronan Point. The large panel joints were not strong enough to withstand a gas explosion. As a result, we were never allowed to have gas in the flats. We have electric heating. When the strengthening works were carried out back in 1970, they were sealed by a combination of wood panels and mastic. This sealing is no longer effective as the mastic sealant has worn away over the years, possibly by movement in the building. As a result, the compartmentalisation of each of the flats has been compromised. For example,

1

I can clearly smell the distinctive smoke from the flat beneath me as the smell comes up the
gaps in the building that are no longer sealed. This must be a matter of serious concern as it
could lead to fire spreading throughout the building. It is this very same breached
compartmentalisation that caused the demolition of the 9 Ronan Point Tower blocks on fire
safety grounds back in the mid 1980s. The architect Sam Webb who organised the demolition
of the Ronan Point Tower blocks in the 1980s came to meetings with the then Borough
Engineer on our estate during the 1980s because of concerns about the type of construction
here. I attended these meetings with my husband Alan.

Our Council held a mayor works presentation/consultation with the residents on our estate
back on the 18th February 2016. They proposed at the time to overclad the buildings with a
form of insulation cladding. Samples of this cladding were displayed to us residents. We were
advised that in order to have this cladding however, it would be necessary to take out our
existing windows and have a different kind put in that would be compatible with the cladding.
This seemed somewhat excessive to us residents; the projected combined cost seemed
prohibitive. The existing U-PVC windows were installed in 1998. These proposed major works
do not however address the matter of our flats having effective compartmentalisation.

I have correspondence from the Council about the necessity for fire prevention works
involving fire compartmentalisation sealing works between walls and communal areas with
certified fire resistant and intumescent materials dated 13th December 2012. This same letter
also referred to the 'fitting of smoke seals to the electrical cupboard doors and fire stop
breaches in compartmentalisation between electrical risers and communal areas' This aspect
of the proposed work was never completed however.

To this day, we do not know for sure whether or not you still intend to carry out these
proposed works. It seems to have dragged on for years. The last correspondence I have
received is dated 4th July 2016; it appears to indicate that you intend to progress the works
and would be offering further consultation about the window replacement and landscaping
works. Could you please give us a definitive answer?

We would also ask that you respond in writing to the following questions;

1. Can you supply me with the details of the actual cladding material you were planning
to install? Is this the same material as they used at Grenfell Tower?
2. Can you confirm the name of the actual contractor you are proposing to use if it were
the case that you intended to go ahead? I presume that this would be some Sub
Contractor of Mitie.
3. Can you supply me with a copy of the last Fire Risks Assessment you have carried out
on our 2 buildings?
4. Are you satisfied with the condition of our 2 blocks? Do you have any reasons for
concern yourself? Can you confirm that you have engaged a structural engineer to
advise you and have you consulted the Fire Brigade? I have a letter dated 13th August
2015 from Stephen Kirrage your Director of Asset Management & Property Services in
which he advises that the Council was engaging a specialist surveying firm Curtins to

TBUK5014