Ledbury Towers Meeting - Questions, Answers and Actions

from my employer? It’s not easy for me to ask for this. | different paperwork – we will clarify what is required and why, and share a list with officers and residents. | with a list of the paperwork/ID we need to process their housing request, and why we need it.
13 | The 80 new properties won’t be enough for everyone. How will you prioritise some residents over others? | We believe some residents will choose to move to a different part of the borough, some will want a different size flat, and not everyone will want to move, but if there are more than 80 people who want a flat in the new block our general rule is to prioritise those who have been on the waiting list the longest, and those who work or volunteer. |
14 | Will we be putting right the damage to décor from work to fix the gaps/cracks? | The contractors should be tidying when they finish their work, but if you are unhappy with the way things have been left please let us know in the office and we will arrange a visit. Given more invasive works are planned for the blocks, when a full refurbishment will be carried out, we do not recommend that residents go to a lot of effort redecorating now. |
15 | What will we do to help overcrowded families? | There is a severe shortage of four bedroom properties in Southwark but we recognise the exceptional circumstances at the Ledbury and will do all we can to help. |
| Structural works and issues: summary
ARUP say that with gas turned off from the blocks the immediate and main risk will be removed. However, given the concerns raised and the apparent issues with the historical documents we have regarding the history of the blocks we want to make sure everything is up to scratch and so we have asked ARUP to continue to do a comprehensive structural investigation that will include getting into other empty properties across all four blocks to advise on works as we move forward into the major works phase. ARUP are the leading experts in this field and are working with others that have extensive experience of large panel system buildings and understand these kinds of buildings. These further investigations will include testing of materials (the concrete) and an engineering assessment to understand where we may want to add to the strengthening of the tower blocks. We have impressed on ARUP the need to conclude all of this quickly but we want the assessments to be thorough. In other major works projects structural surveys can take 9 months but we have asked them to report on 20th November. |