Letter from Southwark Council to Ledbury Residents

ALL RESIDENTS OF LEDBURY TOWER BLOCKS
4 July 2017
Dear Resident
We have today set up a dedicated part of the Southwark website where residents living in each
of the four tower blocks on the Ledbury estate can find information and regular updates on the
current investigations. The link is www.southwark.gov.uk/ledburytowers. We will be posting
copies of the most recent fire risk assessments and all communications that have been sent to
date on this link, as well as frequently updating it with new information.
We know that some people may not have access to the internet so we will still be hand
delivering letters, with regular updates.
Because of the compartmentalisation issues, there is no longer a 'stay put' strategy applied to
the tower blocks. This means that in the event of a fire, we are now working to a simultaneous
evacuation strategy which means that in the event of a fire all residents should leave the
building. The Fire Brigade have also asked us to put in place the following measures to
ensure that residents are able to stay in their homes, pending the outcome of our
investigations into the structure of the towers and the works required.
• Walking Wardens (one per two floors) have now been hired from a private company to
walk the floors during twelve hour shifts (two shifts per day). The Tenants and
Residents Association hall has been set up as a Control Centre and is staffed by
council staff.
• Each block has one person designated to call 999 and to inform the Control Centre of
any potential issues. This person has overall control of the wardens in the block. The
instruction to the Wardens is that in the event of a fire anywhere in the block they are to
alert the residents and assist them to leave the block. In an emergency, priority will be
given to those on the floor of a fire and initially those on the floors above the fire.
• There is communication between all Wardens via radios and between the Control
Centre and the Head Warden and between Head Wardens for each block.
• Work has been going on throughout the weekend and early this week to seal any gaps
between flats. This is not a long-term solution and we await an inspection from Arup
Engineering and subsequently their full report. The report findings will be shared with
you as soon as we have it.
• We have made inspections to all fire doors to ensure they are thirty minutes fire
resistant and have self closing devices. If there is any doubt regarding the validity of a
'notional' door it will be replaced.
• We have applied a 'zero tolerance' approach to all items in the common areas to
include doormats and pot plants. Please do not leave any items in the common areas.
• All flats have an enhanced LD2 part 6 fire alarm system meaning we have coverage to
all rooms in the flats except the bathrooms. All flats have been checked to ensure their
fire alarm is in full working order.
Housing & Modernisation, 160 Tooley Street, London, SE1 2TZ