TBUK4056

Meeting, TRA Hall, Ledbury Estate, Draft Minutes

ARCHIVE DOCUMENT
Not stated
24 October 2017

Arup recommending a further series of works to strengthen the blocks in November
2017.
2.2 The Ledbury Resident Project Group drew up several options which were subject to
consultative ballots by residents on those options. Residents voted to refurbish the
blocks to a safe standard, an option which included the building of 81 new homes
around the towers to fund the additional refurbishment works. That was approved by
the LBS Cabinet in October 2018, subject to further investigations by Arup that required
one of the blocks to be vacated. As Bromyard House was closest to being totally
vacant it was chosen as the block to have the further investigatory works to be
undertaken..
2.3 Arup have carried out investigations into Bromyard Houseand are now in a position to
report what they are recommending to give Bromyard House a further 50 years of life.

3. PRESENTATION FROM ALICE BLAIR, ARUP
3.01 AB presented Arup’s findings with illustrative slides on a projector.
3.02 AB said she would be covering four key things: background on why we are here and
doing this assessment; explaining the recent intrusive investigations in Bromyard
House; the structural assessment of what that means; and the scheme design to deal
with the problems Arup has identified.
3.03 Arup’s work is focused on the resistance of the buildings to disproportionate collapse.
The Ronan Point disaster led to new legislation regarding building construction
standards. The construction of the Ledbury towers is not identical to Ronan Point but
it is similar.
3.04 Arup are looking at how well these buildings can resist disproportionate collapse.
What we have found is that the buildings do not meet those standards.
3.05 Arup also looked at wind loading, as taller buildings should be looked at again now its
effects are better understood.
3.06 Arup have been carrying out intrusive investigations of the superstructure of Bromyard
House, the lift and stair core, and the foundations – the foundations were not possible
to fully investigate while the flats were occupied.
3.07 The residential towers do not meet the Government recommendations for
disproportionate collapse. We understand the response by the council has included
fire wardens on 24hr waking watch in each tower block, and two mitigation measures:
the removal of the gas supply to the towers, and oxygen cylinders are not allowed to
be used at the moment.
3.08 There is enough resistance in the buildings to wind load. What Arup are less sure
about is the extent to which the walls are connected to the foundations. The
foundations are 2.5m below ground level.
3.09 Arup havealso looked at how the buildings could be strengthened to resist the
likelihood of disproportionate collapse.
3.10 Arup recommendation is that steel trusses are erected on the roof, connected to
vertical steel hangers, or beams, fitted inside residents’ properties from the top down
to level 8. These would connect to the floor slabs.