Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
TBUK4023

SGTO Meeting - Ledbury Estate Update

ARCHIVE DOCUMENT
Not stated
25 April 2018

office hear a number of requests from residents as to why they believe they should be
allocated one of the properties and what they would deem to be exceptional
circumstances.’

We have made some demands of the council on these matters, which if you’re
interested in looking at, can be found in the ‘Campaign Blog’ section of our website at
LedburyEstate.com

Southwark Council have told us that they will be making a decision on the future of the
towers this September as to whether they will refurbish or demolish and rebuild.
Although all tenants have been given the Right to Return, and a Cabinet Decision on
this has been published, the detail is still vague. When we pushed Cllr Cryan on this a
few weeks back, she admitted that the Right To Return on the same tenancy basis and
rent rate would only apply if the towers were refurbished. If they are rebuilt, then
returning tenants may be subject to different tenancies and higher rents.

There is a Resident Project Board set-up and working alongside an Independent Tenant
and Leaseholder advisor to shape the options for refurbishment, which range between
£18 and £32 million. Alongside the engineers design plans for strengthening the towers,
Southwark Council’s Head of Engineering is attempting to design a permanent fire
stopping solution to the gaps and cracks, which, having seen the draft, is based on
using fire-resistant mastic sealant in every joint between floors and ceilings and
cross-walls which will need to be inspected and renewed on a regular basis.

A few weeks ago, Dame Judith Hackitt visited us on the Ledbury Estate to discuss her
independent review into Fire and Building Regulations and to take evidence from us as
part of the Resident’s Voice section of the review. What we pressed on her was the
urgent need for residents to be heard and taken seriously when raising matters of
concerns or issues of disrepair which could breach their safety. We asked for an
independent body to be set up to address these matters, with local authorities facing
penalties if they breach fire or building safety regulations in future, which we believe
should be legal obligations. Dame Judith’s final report is due to be published at the end
of May, and we look forward to seeing if she implements any of our recommendations.

Given that we don’t yet know what the councils plans are, the Ledbury Action Group are
fighting for firm assurances in writing for all eventualities on the estate, specifically that
regardless of what happens, the entire estate should remain 100% council homes at
council rents.

TBUK4023
23 of 137