Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
TBUK2240

National Tower Blocks Directory 1992

ARCHIVE DOCUMENT
Not stated
1992

The action plan – Estate Action's approach 
to high-rise housing

Many of the major tower-block 
improvements reported to us in our 
survey have been undertaken under 
the Estate Action programme. We, 
therefore, felt that it would be useful 
to ask the Department of the 
Environment (DoE) to outline their 
priorities for tower-block estates.

David Martin, Estate Action, DoE, 
explains:

By the time Estate Action was set up by 
the DoE in June, 1985, there was already 
plenty of evidence to suggest that 
physical measures, on their own, could 
not solve the problems of rundown 
estates.

The approach adopted by Estate Action 
is, therefore, to help local authorities to 
address the full range of housing 
problems, social and economic as well 
as physical and environmental, and to 
recognise their inter-relationship, and 
then to devise packages of measures to 
deal with them.

CLOSE INVOLVEMENT
Central to the approach is the introduction 
of local housing management, coupled 
with the close involvement of residents. 
The measures which Estate Action 
promotes, and which local authorities 
are encouraged to take into account in 
their schemes, are intended to:

[square] improve not only the physical 
condition of dwellings and common 
areas but also the layout of estates;

[square] encourage measures which improve 
and strengthen housing management and 
involve tenants (developed further in 
the tenants’ charter launched in January, 
1992);

[square] provide tenants with variety and 
choice in housing together with 
economic and social development and 
employment opportunities.

In deciding on the allocation of resources 
to Estate Action schemes, the emphasis 
has been on innovative solutions tailored 
to the needs of each estate rather than 
relying on the application of stock 
solutions.

To aid the process of developing schemes 
the DoE have published the Estate Action 
Handbook. Part 1: ‘Appraising Options’ 
(published in August 1989) sets out a 
four-stage approach to estate 
improvement, starting with a thorough 
assessment of the problems, and 
including a step-by-step method for the 
economic appraisal of alternative 
options.

Parts 2 and 3 of the handbook provide 
design, technical and cost guidance on 
practical ways of improving external 
areas and dwellings themselves.

[caption: Door-entry panel at Lund Point]

POPULAR HOMES
Tower blocks have often been used to 
symbolise all that is wrong with post-
war housing and one of the more 
surprising, but encouraging, aspects of 
public-sector estate improvement has 
been the success with which some tower 
blocks can, with appropriate physical 
and management measures, provide 
popular homes.

The following paragraphs summarise 
some of the measures covered in Parts 2 
and 3 of the handbook which local 
authorities should consider in 
consultation with residents when 
working up schemes to improve tower 
blocks.

continued on next page

158 NTBN DIRECTORY

TBUK2240
240 of 248