The contract for demolition and new build went to Barratts. The TWA group met with Barratts and the demolition firm, Demolion UK, to discuss issues involved in the demolition, such as site safety and asbestos removal.

While the demolition was carried out there was a fire on the top of one block, one worker fell down a lift shaft and was killed, and debris fell into neighbouring gardens. It had been Barratts intention to leave one block, Hulme Point, standing, and to sell the flats.

It is reported that they decided against this in the light of the slump in the housing market and because of the structural information gained on the blocks during the demolition. The TWA group have been very concerned about the high-density of the area, the large number of children and the inadequate services/facilities.

They are seeking to provide such services themselves and have been successful in obtaining an urban aid grant to undertake research and funding development for their proposals. The TWA plan has also been submitted for inclusion in the borough's unitary plan. The group consider their council to be a fair one and they take part in regular consultation with them.

BAE

Newham Rights Centre, 285 Romford Road, London E.15. Tel: 081-555-3331. Contact: Steve Brierley
The Rights Centre offer a range of housing advice to individuals and tenants' associations. They have supported tenants of Brassett Point, Stratford, in their efforts to be rehoused after a fire in which a mother and child jumped from a balcony.

FX

NORTH BEDFORDSHIRE

North Bedfordshire Borough Coucil transferred their high-rise stock to The Bedford Pilgrim Housing Association.

Bedfordshire Pilgrims Housing Association, Pilgrims House, Horne Lane, Bedford, MK40 1NY. Tel:0234 328828. Contact: Mike O'Sullivan.

Bedfordshire Pilgrims Housing Association own 16 tower blocks; 13 of 6 to 12 storeys and three of 12 to 18 storeys. The blocks contain 650 flats and represent 8.6% of the council owned stock.

The blocks were built between 1960 and 1970. The methods of construction used are described as concrete frame, in situ floor and either large panels or brick cladding.

No blocks have been demolished and none has been transferred to other owners. A number of management schemes are currently operating within these blocks.

Two of the 12 to 18 storey blocks provide sheltered accommodation and two of the 6 to 12 storey blocks also provide sheltered accommodation.

The aspects of their tower-block stock which gives them most cause for concern are security, prior to the installation of door-entry systems, and access problems for external maintenance including concrete repairs. The housing association report that the blocks are generally quite popular.

They have confronted a range of tower-block problems. They have carried out a programme of improvements to the central heating system.

They report that they have no hard facts on tenant isolation or depression but they think that it is likely to be a problem for some of their tenants, particularly the more elderly.

Communal rooms have been created in five blocks. Tenants of the sheltered blocks have access to laundries and guest rooms. But generally, they report, there are no communal facilities.

They report that the main pressure on their allocation policy is that there are too many applicants for too few properties. Households with small children are not offered tower block homes; this policy hasn't changed in the last ten years. There is no other category of tenant to whom they would never offer tower-block accommodation.

There are not substantial numbers of children living in the blocks. The housing association consider their relationship with their tenants to be excellent and they take part in regular consultation with tenants' organisations.

They promote and help tenants' associations generally and are working towards the formation of a tenants' federation. They provide financial support for their tenants' associations.

HIYBS

Greyfriars Residents Association, 10 Roise Court, Bedford, MK40 1JJ. Contact: Mrs R. Whittington.

The Greyfriars Residents' Association describe their estate as a medium town/suburban mixed community. The estate has four tower blocks; all of 6 to 12 storeys. The blocks contain about 250 flats and represents 100% of the total estate. The blocks were built between 1957 and 1960. The method of construction used was in situ concrete. No blocks have been demolished. These four blocks were transferred to the Bedford Pilgrim Housing Association by the North Bedfordshire Borough Council.

There are no particular management schemes operating in the blocks. The aspects of the tower blocks which give the most cause for concern are noise from traffic, other tenants and nearby clubs, and anti-social behaviour from other tenants.

When describing the estate generally, the association point to vandalism and lack of police supervision of local clubs as the main problem. A small number of children live in the blocks. The association feel that the blocks are not an appropriate place for children and some tenants have

NTBN DIRECTORY 63