Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
TBUK2086

National Tower Blocks Directory 1992

ARCHIVE DOCUMENT
Not stated
1992

BIRMINGHAM

Birmingham City Council, Louisa Ryland House, 44 Newhall Street, Birmingham B3 3PL. Tel: 021-235 4559. Contact: Stephen Smith

Birmingham own 421 tower blocks: 287 are of 6 to 12 storeys, ten4 are of 13 to 18 storeys and 30 are over 18 storeys. This represents 21,400 homes and is 19% of the council's stock. The blocks were built between 1953 and 1972. The methods of construction used were traditional column and beam, plus large panel systems and Wimpey no fines.

Eight blocks have been demolished for structural and/or social reasons. Two blocks have been transferred to other owners. They have been transferred to Copec Housing Trust on a short-term licence agreement.

A variety of management schemes operate in Birmingham, including vertical warden schemes (one of which is described as an extra-care scheme), maturity blocks, single-person blocks, concierge blocks and housing co-ops.

The aspects of their tower block stock which give the authority most cause for concern are structural problems, security, heating and insulation, general design faults, fire stopping, water penetration and social isolation.

They have responded to these problems by undertaking pest control within individual flats as necessary, organising a heat-lease scheme, and offering improved heating systems to certain blocks and energy conservation programmes to improve insulation, and encouraging the formation of residents' groups to overcome isolation.

They have established common rooms in blocks, housing officers constantly monitor any disturbances, there is a city-wide programme to deal with any building defects, concierge schemes operate in a number of blocks, and Estate Action work has been carried out to improve the environment and layout of some tower block estates.

The council do not have enough accommodation to meet the demand. In 1990 there were over 10,000 homeless applications in the city. They also feel that the dwellings within their stock are not suitable necessarily to meet the needs of the applicants or of transfer requests. Families with young children are offered tower-block accommodation, although there are restrictions.

Only the bottom five floors in each high-rise block are offered to young families and then only if there is not more suitable accommodation available elsewhere. These policies have changed in the last ten years.

Previously some blocks were designated as ‘no child blocks’. However, increasing pressure for accommodation has led to these restrictions being lifted so that the bottom five floors are available for families with children.

Warden-controlled schemes, maturity blocks and single-person blocks do not have children on any floor. They do not offer tower-block accommodation to people who require more than three bedrooms and people who are considered unsuitable on medical grounds.

They have no stringent policy on the number of offers which are made to each potential tenant - it depends on the individual circumstances. There are not substantial numbers of children living in their tower-block flats.

Birmingham are considering introducing compensatory services and facilities into their tower blocks. They consider their relationship with their tenants to be good and they do take part in regular consultation with tenants' organisations. They take part in this consultation via their tenant participation section and their local neighbourhood office teams.

CVHPXIAYFLRDSE

Community Energy Research, 3 Tower Street, Newtown, Birmingham, B19 3RL. Tel: 021 35929ten. Contact: Keith Bennett

Community Energy Research (CER) was set up by the West Midlands Heating Group to tackle fuel poverty. CER offer independent energy advice to tenants and community groups. Their work focuses on forms of housing which are hard to heat. CER organised a national conference in 1990 on high-rise heating issues.

CER carry out energy audits, e.g. they are currently carrying out an audit for the Three Blocks Association in Birmingham. They will be idenifying the problems and suggesting a range of affordable heating options. CER are working with Birmingham Council in the ‘Keep Birmingham Warm’ campaign.

They are raising awareness about heating issues amongst front-line social services and housing staff. CER operate the National Energy Foundation software for energy rating in homes. They focus on condensation-risk analysis, i.e. working out the level of heating required to avoid condensation at a price tenants can afford.

HD

Druids Heath Tower Blocks Association, 31 Middlefield House, Britford House, Maypole, Birmingham, B14 5LG. Contact: Mrs K Eglinton.

Druids Heath Tower Blocks Association describe their estate as an outer estate. There are 16 blocks on the estate, all of 6 to 12 storeys. The blocks contain 800 flats and represent between a quarter and a third of the total estate. The method of construction used was large panel Bison, built under license by Bryants. No blocks have been demolished and none has been transferred to other owners. A number of management

6
NTBN DIRECTORY

TBUK2086
85 of 248