London Borough of Newham Press Release, 'Go Ahead for Ronan Point Demolition'

1.1. HISTORY
Ronan Point is one of Nine Larsen-Nielsen System built high rise
blocks of flats constructed by Taylor Woodrow Anglian for the
London Borough of Newham during the late 1960's and early 1970's.
Ronan Point like its sister blocks comprises 22 floors of flats
and has overall dimensions of 80 ft. by 60 ft. and is 210 feet
high.
All the nine TWA blocks are constructed in [illegible]
[illegible] six blocks including Ronan Point have a type A joint
system and 3 blocks have a type B system. The systems differ in
that the type B system has interlocking reinforcement and this was
a modification following the partial collapse of Ronan Point in
1968.
The partial collapse of Ronan Point occurred due to a gas
explosion in a flat on the 18th Floor. The explosion caused a
flank wall panel to the South East Corner to blow out removing the
support for the floors above, these in turn collapsed and the
weight of the resultant debris caused the floors below to collapse
progressively down to the podium level. The remainder of the
structure was undamaged. Four people died as a result of the
collapse and a public inquiry was held.
Subsequent to the inquiry the South East Corner of Ronan Point was
rebuilt on an insitu concrete frame. Additionally gas was removed
from all six of the type A blocks which were built or under
construction and strengthening angles added to the joints to allow
the buildings to resist explosive forces of up to 2.5 lb\sq.in.
The remaining three blocks, known latter as type B, which were at
the time of the collapse still being designed were modified to
provide a minimum resistance to explosions of 5 lbs\sq.in. and
were provided with piped gas.
All the TWA blocks were then occupied until the recent
investigations carried out in 1984.
Recent Investigations
To prioritise planned maintenance and to ensure the public
safety of the Borough s 115 Tower Blocks an enhanced 5 year
rolling programme of inspections was started in 1983.
During the inspection of Ronan Point in early 1984 reports were
received from tenants that gaps had appeared at the interface of
cladding panels and floor slab edges. These gaps represented a
potential fire and smoke transmission risk. Consultants were then
employed to carry out a full structural appraisal of Ronan Point
and to enable extensive exploratory works to be carried out the
block was evacuated.
The structural appraisal found considerable defects in the flank
wall\floor joints and analysis of these defects indicated that
zones of high stresses together with uncertainty of load
transmission existed through the joints. As a result of these
defects the strengthening angles added after the collapse in 1968
were found to be required for security under normal loading with
little reserve for abnormal loading. In particular the integrity
of the joints under fire loading could not be guaranteed.
Following the investigations an economic assessment of the block
was carried out with regard to essential and desirable
refurbishment costs. Desirable costs being those required to
bring the block up to reasonable modern standards and to assist in
the effective management of the block.
The essential remedial works to the block were estimated at £3.50
Million or £28,800 per flat. Desirable refurbishment costs, were
estimated at £5.72 Million or £52,000 per flat.
DEMOLITION
From consideration of the costs involved in refurbishment
together with the social considerations or the chequered history
of the block reducing the prospect of the homes being provided
which would meet with tenant satisfaction, demolition was clearly
the correct course of action.
Following Department of the Environment agreement to continue
subsidy after demolition, tenders were invited for the dismantling
of Ronan Point.
Due to the asymmetrical properties of the block from the insitu
rebuilt corner, together with environmental considerations and the
Building Research Establishment's desire to carry out research on
the block, explosive demolition was rejected.
To allow the BRE to carry out tests on selected panels from the
block at their research station and to minimise disturbance to
local residents a reverse building or dismantling method of
demolition was chosen. By this method the precast panels are
taken down as whole pieces to ground level and then transported
off site for disposal.
The six tenderers invited to tender were chosen from the response
to an advertisement in the technical press. The contractors were
chosen on the basis of their technical and financial suitability
for the project.
The tender has been awarded to Messrs. Griffiths McGee Demolition
Company Limited in the sum of £577,679. The contract period is
one year and it is expected to commence in May 1986.
The Building Research Establishment are making a contribution of
£34,000 towards the extra costs involved in providing the research
opportunities during the dismantling.